House # D-80 Power
Complex Colony Barotha – Attock, Punjab, Pakistan
Target job
Desired Status:
Full – Time
Career Level:
As per qualification and
experience
Date of Availability
Immediately
Perfonal data
Father’s Name: NOOR
BADSHAH
Date of
Birth: 13-01-1970
Sex: MALE
Nationality: Pakistani
Passport # KE
078862
Domicile: NWFP
Religion: Islam
Languages: English, Urdu, Pashto
N.I.C.# 17101-0339223-1
Cell #
0302-5961895
Qualification
Certificate / Degree
Board / University
Matric Peshawar
Board
F.A. Peshawar
Board
B.A Peshawar
University
Technical qualification
Two years
Certificate in Electrical Training From Punjab Board of
Technical Education, Lahore (1999)
Training
Fourteen Weeks Training in Basic
Operator Course from Thermal Training Centre Multan.
Three months working as a Fitter
with Energomash corporation department of ASIA (RUSSIA). During the
overhauling of Steam Turbine and Boiler of Unit # 1.
Three months Basic Craftsman Course
(Electrical in Mangla Training Center).
Awarded Certificate during the
training of Basic Craftsman Course for Well Know from Mangla
Training Center.
Two Weeks Training in Industrial
Electrical Skills from WAPDA Engineering Academy Faisalabad.
Two Weeks Fire Prevention & Safety
Officer’s Course for Oil Installation at National Institute of Fire
Technology Islamabad (Directorate General Civil Defense).
Responsibility/
experience on electrical side includes
Knowledge about Power House and his
Auxiliary Power Supply (11KVA, 0.4 KVA)
Knowledge about 500 KVA Switchyard
of Power House.
Maintenance of SF6 Circuit Breaker,
current transformer, lighting arrester and air compressors.
Testing of SF6 Circuit Breaker with
time motion analyzer (TM-1600) to measure the opening / closing time
of contacts.
Checking of SF6 gas leakage with
leakage detector.
Checking of SF6 gas quality.
Testing of circuit breaker with
Micro Ohm Meter (Type MOM 600A) to measure contact resistance.
Testing of Transformer winding with
Insulation Tester / Meager.
Knowledge about CNDF Test of
Transformers.
Knowledge about TTR Test of
Transformers.
Testing of Transformer Oil with
dielectric oil tester.
Dehydrating of Transformer oil with
dehydration plant.
Maintenance of Power Transformer,
(18KV, 500KV, 220KV-11KV, 11KV).
Maintenance of 220V/48V batteries
(Lead Acid).
Installation & Dismantling of
electrical equipments.
Maintenance of Oil Vapor Collector.
Maintenance of dust Collector.
Worked on Governor Pumps and
Electrical Control System.
Maintenance and meggar of Main
Generator and their Auxiliaries.
Maintenance of 11 KVA Diesel
Generators.
Maintenance of Generator Transformer
(107 MVA).
Working and maintenance of 450 / 60
ton 145/20 ton 70/10 ton & 6/2 ton over head cranes, Gantry cranes
of 100 ton, 75 ton & 60 ton capacity. (Also operated the above
mentioned cranes).
Testing and meggaring of 18 KVA unit
transformers.
Testing and meggaring of excitation
transform.
Experience
about Thermal Power Plant (Operational & Maintenance)
Worked as a station attendant at
thermal power station Muzaffargarh on steam turbine 210 MW and his
Boiler Side. (Boiler Capacity 670 ton p/hrs cm 540).
Fully operate, start up and shut
down of boiler.
Control of monitoring handling unit
and with repairing plant on local side.
Worked on steam turbine and its
auxiliary.
Well knowledge about generator and
generator synchronization.
Worked on soot blower of Super
Heaters.
Worked on short blaster of
economizer.
Worked on periodic blow down drain (PBD)
value operational and maintenance.
Worked and maintenance, regenerative
air heater (RAH) soot blowers.
Worked on gun purging of boiler fire
system.
Worked on ID fans / FD fans and GR
fans.
Worked on condenser, hot well,
condensate plant feed tank, CW pump station, feed pump and
condensate pump etc.
Well knowledge about
demineralization plant.
Fire System
Knowledge about powerhouse safety
and firefighting system.
Worked on fire alarm, smoke
detector, fire indicator, fire fighting and fire protection system.
Other
responsibilities
Worked closely with Team members to
coordinate and support the development of plans and schedules for
project through integrated activities.
Monitor status of project execution
through the Leading Engineers, support performance analysis and
provide alerts to potential problems.
Periodically prepare and report /
present status information on project.
Work closely with project Management
/ operations to ensure smooth cross-functional team execution and
successful completion of project.