PROFESSIONAL
PRÉCIS
- A result oriented professional
with over 9 years’ experience in Project Management,
Installation & Commissioning, Operations & Maintenance, Process
Enhancements and Team Management.
- Deftness in project monitoring &
reviewing project schedules, ensuring cost control within
budgeted parameters / norms.
- Experienced in maintenance /
operations of a wide spectrum of equipments and components.
Adept at preventive and breakdown maintenance.
- An out of box thinker in
implementing cost saving measures to achieve substantial
reduction in terms of man days, raw materials and energy
consumption.
- An effective communicator with
exceptional relationship management skills with ability to
relate to people at any level of business.
CORE COMPETENCIES
Project Planning &
Management
- Managing overall operations for
executing projects within cost & time norms.
- Participating in project review
meetings for evaluating project progress & de-bottlenecking.
- Preparing project schedules and
monitoring projects with respect to Cost, Resource Deployment,
Time over-runs and Quality Compliance to ensure timely execution
of projects.
Installation &
Commissioning
- Identifying project bottlenecks
and undertaking corrective measures.
- Ensuring effective site
management and discipline to ensure safe & timely execution of
the projects.
- Installing and commissioning of
equipments, followed by plant trial runs meeting targeted
performance/ quality & quantity parameters and thereafter
handing over of the plant.
- Implementing control of work
procedures such as job safety analysis, risk assessments, permit
to work system, tool box talks, safety walks and safety
induction, and ensuring zero accident, etc.
Maintenance /
Operations
- Planning and effecting
preventive maintenance schedules of various machineries and
instruments to increase machine up time and equipment
reliability.
- Proactively identifying areas of
obstruction/breakdowns and taking steps to rectify the
equipments through application of trouble shooting tools;
include failure analysis, repeated errors, root cause analysis.
- Technologically upgrading of the
obsolete Machines.
- Executing cost saving and energy
saving techniques/measures and modifications to achieve
substantial reduction in O&M expenditures and work within the
budget.
Spare Parts
Management
- Designing, implementing and
monitoring effective procurement schedules along with finalizing
the specifications of the spare parts and establishing the
quality & quantity limits.
- Looking after indigenization of
the spare parts.
Man Power
Management
- Monitoring the performance of
team members and training them to ensure efficiency and meet of
individual & group targets.
- Streamlining efforts for
attainment of short and long term goals of the company taking
into care the mission and vision.
EMPLOYMENT HISTORY
Since Jun’08 with
XL Telecom & Energy Limited, Secunderabad as Maintenance In-charge
(Solar Cell Manufacturing Division)
Accountabilities:
- Managing the installation /
commissioning / troubleshooting / maintenance of:
- 33KV/11 KV 16 MVA Sub
Station.
- 120 MW Solar Call
Manufacturing Machine line(In-Tex Acid Texturing/Etching,
P-Doper, Diffusion, PSG Etching, ARC Coating, Metallization
Printing Laser Edge Isolator).
- Clean Room Facility as per
Solar Semi-Conductor Sector requirement.
- DI Water Plant, CDA, HVAC
6X2 MVA DEG System, 16MVA Sub Station, 600KVA UPS System,
Fire Fighting system and Raw Water Network.
- Chemical Distribution System
(HNO3, HF, HCL, H2O2, PV-160, NaOH, CH3COOH, FSO-100 and
H3PO4/C2H5OH).
- Scrubber system, Gas
Abetment system and Exhaust system.
- PA System, IT Server, FMCS,
Access Control System and Orbit Control System.
- Responsible for effluent
calculation as per process tools and WWT management.
- Functioning on Bulk Nitrogen,
Hydrogen and Silane Gas Distribution System.
- Working towards the improvement
in building design as required for Solar Cell Manufacturing
Plant.
- Looking after the design of
Power Distribution System and Fuel (HSD) Management.
- Clean room facility management.
Highlights:
- Devised / formulated a new
concept of Power Distribution System for Plant: 2 step raw power
distribution. Emergency power (DG) system 6x2Mva 11kv
O/P and UPS system design 3x200 kva.
Jul’05-May’08 with
Reliance Industries Limited, Indore as Project Engineer (Electrical)
– Construction Division for Madhya Pradesh & Chattisgarh
Accountabilities:
- Responsible for the
commissioning and maintenance of Reliance Petrol Pump (COCO,
DODO, CODO, RFO, Auto LPG Station, Aviation Fuel Station) like
30 KVA D.E.G., 3 KVA U.P.S., 25 KVA AVS, SMPS, V-SAT, Air
Compressor, Dispenser, Cable Laying Termination, Connection,
Testing; Poll Mounted Sub Station Commission, Charging as per
specifications.
- Looking after the execution of
civil jobs as per specifications & drawings.
- Monitoring the mechanical works
like Fuel Line Piping work (Threaded & Welded Piping).
- Handling hydro testing,
cardboard blasting & FRP tank testing by Meno-Meter.
- Taking care of execution of
Asphalting work and all types of testing for bitumen paving,
cathodic protection work for LPG tank, highly inflammable gas
storage station commissioning, commissioning of submersible
turbine LPG pump, ROV, SOV and MOV.
Highlights:
- First person to make Ideal
Retail Outlet as per the drawing & specifications.
Aug’03-Jul’05 with
Hot Line CPT Ltd., Bhind as Junior Engineer Electrical - Utility
Accountabilities:
- Looking after the operation and
maintenance of 132/11 KV Sub Station 2x625 KVA DG System, HVAC,
DI Water Plant, N2 Plant and Switch Yard.
- Taking care of the
commissioning, troubleshooting & maintenance of electrical power
equipments.
- Working on WWT System,
Electro-Pneumatic Equipment, Vacuum System, Control Panels, etc.
- Responsible for maintaining the
Clean Room Facility as per semiconductor sector requirement.
Mar’00-Jun’03 with
GAIL India Ltd.
IPS Samakheli is
the 1st Booster Station of World’s longest
LPG Pipeline of Gas Authority of India Limited, a Navratna Public
Sector, undertaking of Govt. of India.
Growth Path:
Supervisor -
Operation & Maintenance, Vijaypur Mar’00-Oct’01
Engineer Assistant -
Operation & Maintenance, Samakhiali Nov’01-Jun’03
Accountabilities
(Engineer Assistant - Operation & Maintenance):
- Responsible for handling the
TATA-Honeywell PLC System for speed control of main line of LPG
pump recording of various operation parameters.
- Looking after the operation and
maintenance of 66 KV Switchyard 6.6 KV System, Vacuum Circuit
Breaker, 1275 KVA DEG 415 V System including LT Panel Feeders &
Tr. Unit 898 KW Elec. Motor driven by variable Speed Drive
System for Main Line Pumps 625 KVA UPS, Battery Bank.
- Taking care of the operation of
M/L Pump (898KW) by PLC, SCADA and maintenance of various type
of equipment in plant & pipe line as like 1275KVA DEG, 66/6.6KV
Sub station, 3MVA, 630KVA Tr. Unit, Thermo Electric Generator
and 625 Kva UPS system.
Accountabilities
(Supervisor - Operation & Maintenance):
- Responsible for the electrical
maintenance works in the plant area.
- Handling the operation and
maintenance of 2 - 132/66 KV Switchyard, 16MVA Tr.unit, Fire
Water Network, Gas Turbine Generator, Thermo Electric Generator,
and Veriable Speed Control Drive.
Highlights:
- Involved in the re-commissioning
of the entire plant for resumption of NATMAL operation after
killer earthquake of 26th January 2001.
QUALIFICATIONS
Pursuing MBA in Project &
Marketing Management from Prestige Institute of Management &
Research, Indore.
B.Com. from Jivaji
University, Gwalior in 2005.
Diploma in Electrical Engineering
from M.P. Technical Education Board, Bhopal in 2000.
PERSONAL DOSSIER
Date of Birth : 14th
August 1981
Languages Known
: English & Hindi
Address : 5/202,
New Malhar, Sahara State, Mansoorabad, Hyderabad – 500068,
A.P.
|